How long will my kitchen be unusable?expand_more
For a full remodel, plan on six to twelve weeks of construction once materials are on site, plus the planning and lead-time months before that. Most families set up a temporary kitchen with the fridge, microwave, and a sink elsewhere in the house. Ask your contractor for a week-by-week schedule at contract signing.
Do I need a designer as well as a contractor?expand_more
Not always. Many metro remodelers run design-build and include drawings and selections in the contract. An independent designer earns their fee on complicated layouts, historic houses, or when you want someone advocating for you separately from the builder.
What should a contingency be?expand_more
Ten to twenty percent of the contract, and closer to twenty in a pre-1950 house. Rotten subfloor under a dishwasher, undersized wiring, and out-of-level floors are found after demolition, not before. A contractor who tells you there will be no surprises hasn't opened many old walls.
Will a remodel pay for itself when I sell?expand_more
Mid-range kitchen work generally returns a decent share of its cost in this market, and upper-end custom work returns less proportionally. If resale is the main motive, keep the scope tight and the finishes broadly appealing. If you're staying a decade, build the kitchen you actually want.
Can I supply my own cabinets or appliances?expand_more
Many contractors will allow it, but expect them to exclude warranty and damage responsibility for owner-supplied items, and to charge for delays if something arrives wrong. Get the split written into the contract so there's no argument in week six.