Can I put hardwood in a basement?expand_more
Solid hardwood, no — below-grade moisture will move it. Engineered wood or quality LVP over a proper moisture barrier is the standard approach in metro basements. Have the slab moisture-tested first regardless of which product you choose.
How many times can a wood floor be refinished?expand_more
Solid wood generally tolerates several sandings over its life, but each takes material off and old fir floors in metro houses have often had one or two already. An installer can measure how much wear layer is left at a heat register or a doorway before you commit.
How long will the house be disrupted?expand_more
LVP and laminate in a few rooms usually take one to three days. Hardwood installation plus sand and finish runs closer to a week, with the finish curing after that. Plan to be out or confined to other rooms during sanding and finishing, and expect the smell to linger a day or two with some finishes.
Do I need to remove baseboards?expand_more
Not always — installers can undercut door casings and use shoe moulding at the walls, which is cheaper and faster. Pulling baseboards gives a cleaner, more built-in look and costs more in labour and paint touch-up. It's a finish decision worth making before the crew arrives.
Should I buy my own materials?expand_more
You can, but installers who supply the material usually stand behind both product and labour as one warranty. If you supply it, order 10 to 15 percent extra for waste and confirm the exact product with the installer before ordering. Mismatched lot numbers are a common and avoidable headache.